The experience of pouring finished concrete rain

The most difficult while piling concrete, floor, roof, ... is when the concrete is poured or pouring rain finish. If this is the case, not all investors have the experience of handling, or there are also very awkward in the implementation steps, even very worried even after finishing the house.

Here are some tips to prepare before, during and after pouring rain, so that you can handle the problem.

Experienced process when pouring concrete finished meeting the rain

First, prepare before pouring concrete.

To prepare concrete, the first thing many families choose is to see the feng shui master. It is not natural that this concept is widely spread in folk from ancient to present.   In important tasks such as groundbreaking, manicuring, concrete pouring, etc., after the necessary procedures, rain is considered fortune and fortune. In Feng Shui there is also the sentence: "Son of the nail, water management" - this means that the mountain of nails, the land of fortune. Water will symbolize fortune, so anything related to building, housing related water-water are many owners want and like.

Also on the scientific view, when poured concrete rain, this view is also based on the fact that when poured concrete floor, the roof after a few hours also need water to damp the concrete. This is very good in engineering because it is good for the structure, the concrete is stronger and more durable. Therefore, if it rains after pouring concrete foundation, the roof will be "natural" to help the owner of this problem without the need for labor, manpower and time.

Thus, the interpretation on both feng shui and practical science, the concrete poured after a few hours quite nice. However, many constructions, as well as homeowners, are difficult to obtain.

Pre-pouring work needs to be carried out by the next step: Weather forecast

Keep track of weather forecasts to make sure that during and after the time you poured concrete will not get too much rain. This will help the family reduce the risk while pouring. If rain is poured in the rain season, the rains often come in handy, so you can do other preparatory work so that you can still work on schedule.

Prepare the necessary equipment before pouring concrete to encounter rain.

Before placing concrete, you should prepare some items necessary to cover the rain for your home.

- Review and re-check the water drainage system to ensure that heavy rain will drain away quickly, without damaging the structure, especially the concrete (if the concrete pits are poured).

- Prepare about 1-2 large, thick canvas cover can rain protection if the rainfall and rainy time

.... Of course, people and occupational safety always put on the top, when the concrete poured with heavy rain, absolutely should not continue.

The experience of pouring finished concrete rain

Second, if the concrete is poured in the rain, how will it handle?

- Evaluate precipitation, thereby assessing the level of rain affecting the concrete, making the decision whether or not to continue pouring concrete. There will be two cases:

1: Small rainfall: Can continue construction

2: If the rainfall is heavy and the rain lasts longer than 1, 2 hours and then it should be covered canvas, then stop rain can be applied. Check the safety of construction work in rain conditions such as power shortage, concrete transport road and protect the poured concrete by shielding canvas against rain water.

When it is raining, then it is not recommended to continue construction but have to wait for the intensity of concrete reached 25 daN / cm2 (temperature)

Experience pouring concrete when it rains

Concrete Stacking - Experience in finishing concrete pouring rain

It is important to understand what a stop circuit is: The stop circuit is an interruption in concrete placement in certain areas (in this case the stoppage when it is raining is considered a stop). At this point, the concrete is poured after, poured when the previous concrete has frozen.

When the rain is too great, before stopping, you have to make a flat circuit that is perpendicular to the force applied to the structure.

Handling of concrete stops when it rains: When the next concrete layer is poured, the circuit must be carefully treated so that two new and old concrete layers stick together. It is recommended to use some construction methods as follows:

Experienced process when meeting the rain finish: Stop processing

- Clean and water the cement to the old concrete surface before pouring the new concrete

- Dissolve the surface, chisel out the poor quality concrete, and then water the cement.

- Use adhesive additives for stop circuit

- Put the steel blade in the stop position when installing the concrete layer first

Especially, when laying concrete piles, large floor (or large block structure) we should split the area pour into many parts, the same choice of circuit break construction. If it is raining then the concrete treatment is very simple and effective for you and your family.

If the case can not be handled, the only, least expensive way is to completely knock off and do it again.

The construction, pouring concrete that rainy weather is not wanted. Therefore, you should be prepared carefully and take appropriate measures, correct and accurate to get the process of casting the best smooth.

(Collect)